Our Mission is to remain a recognized leader in providing premier services and solutions in multi-disciplined (Construction, Security, IT, Logistics, Emergency Response) areas for the Federal government.  We are committed to supporting our clients' requirements by delivering high-end, cost-effective, competitive, on-time and ethical services for every job that we perform.  Our goal is to provide our employees with a caring, engaged and challenging work environment while giving back to our shareholders the best possible return on their investment.

Construction Services Past Performance

The Doyon Construction Group seeks substantial general contracting opportunities, and can complete any phase of a civil engineering or environmental project while meeting and exceeding Government requirements.

Cherokee General, A DOYON Government Group company
a Doyon Government Group Company


topic head bulletUSACE Fort Lewis Wastewater Treatment Clarifiers, $2,400,000 - NEW

Doyon Chiller installation, Edith Green Federal Building
  • Renovate and upgrade four primary wastewater treatment clarifiers
  • Design and repair failing components
  • Repair/resurface tank floor and walls
  • Repair damaged electrical systems
  • Project is located at Solo Point near Joint Base Lewis-McChord, WA

TOP



topic head bulletDOT-FHA Washington Area MATOC, $20,000,000 - NEW

FHA
  • MATOC contract for emergency road repairs and bridge construction projects throughout Washington State
  • Associated work includes roadway excavation, surveying, clearing, surfacing applications, utility relocation, parking lots and trails
  • Emergency road repairs work includes preliminary engineering, construction and temporary traffic operations during or after a natural disaster or catastrophic failure
  • Federal roads and Tribal lands are included under this MATOC

TOP



topic head bulletU.S. Naval Academy-Repair McNair Bridge, $1,900,000 - NEW

US Naval Academy
  • Re-design and repair of the primary commercial traffic route through Academy grounds
  • Scope of work includes:  detailed engineering study, design of multiple alternative repair options and repair of deteriorated structure and restoration of original load bearing capacity

TOP

topic head bulletUSACE SOF Education Center Design/Build and Aviation Barracks Site Work - Ft. Lewis, WA, $12,579,000

SOF Aviation Design/Build
  • Includes the design and construction of a Special Operations Forces Education Center at Ft. Lewis, WA
  • Includes site work at nearby aviation barracks

 

TOP


topic head bulletUSACE Malmstrom Weapons Storage Area Upgrade Phase 1 - Great Falls, MT, $10,480,500

Doyon Project Services
  • Demolition of prior utilities, walkways, parking, fencing, landscaping, and munitions igloos
  • New construction of utilities, walkways, parking, fencing, landscaping, and munitions igloos
  • Construction of new inert storage building

TOP



topic head bulletMultiple Award Task Order Contract (MATOC) for General Construction, Design/Build, $100,000,000

Doyon Chiller installation, Edith Green Federal Building
  • U.S. Army Corps of Engineers, Seattle District W912DW-08-R-005 $100 million, Base Year, 4 Option Years, Washington, Oregon, Idaho, Montana
  • MATOC for Design/Build construction services throughout the Northwest region in support of military construction programs
  • Work will include Design/Build and general construction services for new facility construction and renovations

TOP


topic head bulletFAA Design Build ID/IQ, $10,000,000

Doyon Chiller installation, Edith Green Federal Building

The Federal Aviation Administration (FAA), Western Service Area, has awarded Doyon Project Services, LLC with a statewide Construction and Design/Build (D/B) Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract in support of construction and environmental projects throughout the State of California.

  • One year, $10 million, firm fixed price (FFP), ID/IQ contract
  • Construction, renovation, repair, alternations, rehabilitation design-build
  • Fast contract accessibility
  • Quick turnaround scheduling and project completion

TOP


topic head bulletTukwila #5 Levee Repair Green River - King County, WA, $4,100,997

Doyon Chiller installation, Edith Green Federal Building
  • Excavate, Line and Grade
  • Remove trees/levee material and grub
  • Provide erosion control and sedimentation structures
  • Provide Class-IV Rip-Rap
  • Install reinforced concrete retaining walls
  • Provide hydro-seed, topsoil

TOP


topic head bulletWolf Creek Dam Restoration - Russell County, KY, $9,890,000

Doyon Chiller installation, Edith Green Federal Building

Halcomb Boat Landing at Wolf Creek Dam was issued by the Nashville District Corp of Engineers.

  • The scope of work consists primarily of the following:
    • Excavation of approximately 314,463 cubic yards of rock and soil
    • Placement of the rock and soil in designated areas for use in construction of a staging area, boat ramp and public roads
  • Construction included:
    • 4,400 foot asphalt access road
    • 80-space asphalt parking lot
    • 600-foot by 70-foot boat launching ramp
    • 2-unit comfort station and installation of appropriate sewage disposal facilities

TOP


topic head bulletUS Army McDonald Hospital Energy Management - Ft Eustis, VA

Doyon Chiller installation, Edith Green Federal Building

Provide complete exterior utility systems monitoring solution to allow for scaling and control of energy consumption for the electrical apparatus that services the hospital complex of buildings

  • We also provided HVAC micro upgrades to prepare for ”green” certification.
  • Provided utility monitoring of electrical feeds for all buildings and connected via new underground network
  • Upgraded Tridium DDC controls for two cooling towers
  • Reworked all controls wiring for HVAC air handlers to incorporate legacy controllers into new Metasys System
  • Provided complete project oversight, engineering, and quality control
  • Built control platform for future building automation package
  • Replaced variable frequency drives
  • Balanced air loads to accommodate trend patterns

TOP



Cherokee General, A DOYON Government Group company
a Doyon Government Group company



topic head bulletUSACE DSC Miscellaneous Roof Repairs, $2,520,287 - NEW

USACE
  • Roof repairs of Buildings 31, 32 and 33 at Defense Supply Center, Richmond, VA.
  • Deck repairs and restoration coating of approximately 79,000sf of roofing.
  • Work includes inspecting, repairing and reattaching damaged roof membranes.

TOP

topic head bulletNAVFAC NW Replace Roof and AHU Hangar 12, $1,502,600 - NEW

NAVFAC
  • Design/Build a replacement roof and replace air handling units on Hangar 12, NAS Whidbey Island, WA.
  • Replace roof and roof mounted AHU.
  • Upgrade the existing lighting fixtures to “smart lighting” in Hangar Bay.
  • Install day lighting in Hangar 12.

TOP

topic head bulletGreen River Levee System - King County, WA, $9,000,000

Green River Levee
  • Rebuilt over 2,500 LF of failing dike system at four locations spread out over a fifteen mile area in one condensed season July-October
  • All projects completed ahead of schedule despite delayed award and owner permitting process
  • Extensive salmon & erosion mitigation measures
  • Extensive multiple agency involvement including County, municipalities, State, Federal, and Tribal as well as numerous landowners

TOP


topic head bulletFort Lewis Barracks Renovation - Fort Lewis, WA, $6,100,000

Ft. Lewis Barracks Renovation
  • Complete renovation of all plumbing stacks, restrooms, laundry rooms, corridors, entry and commons areas in six buildings
  • Extensive phasing and coordination around troop deployments and partially occupied facilities
  • Asbestos abatement
  • Extensive demo, tile work, plumbing, mechanical, and interior finishes

TOP


topic head bulletNaval Operations Support Command Building Repairs - Portland, OR, $5,724,265

NOSC Building
  • Removal and replacement of existing metal siding
  • Removal and replacement of all windows
  • Demolition of existing trailer
  • Replacement with pre-engineered metal trailer

 

TOP


topic head bulletRend Lake Spillway Campground Renovations - Benton, IL, $3,646,489

Rend Lake Recreational Area
  • Renovation of entire USACE Rend Lake recreational area
  • Repair and overlay of all roads
  • Design/Build of new bike trail system
  • Design, modernization and repair of both the campground and day use areas

TOP


topic head bulletFort Lewis Tank Remediation IDIQ - Fort Lewis, WA, $1,130,000

Ft. Lewis Tank Remediation
  • Three concurrent contracts for Site Assessment, Removal of AST’s and UST’s, of up to 484 World War II era fuel storage tanks located adjacent to, and under existing barracks and other facilities
  • Site assessment
  • PCS soil remediation
  • Tank removal and new tank installations
  • Partnered with USACE to help to develop an on-base recycling program allowing for mitigation and eventual re-use of contaminated soils

TOP


topic head bulletChiller Replacement Edith Green Federal Building - Portland, OR, $1,200,000

Doyon Chiller installation, Edith Green Federal Building
  • High profile project that required the shut down of 2nd Avenue in downtown Portland for a period of three days in order to hoist out the prior chiller equipment through an opening in the side of building on the 18th floor
  • Complete replacement of all chillers, variable frequency drives, isolation dampeners, piping
  • Extensive coordination, planning, and safety training

TOP


topic head bullet911 Federal Building New Fire Alarm System - Portland, OR, $1,100,000

Doyon fire alarm systems in GSA Federal Building
  • Design-Build complete replacement of all fire alarm systems in active Federal Building
  • Extensive scheduling
  • High security areas/Secured Federal Building

TOP


topic head bulletFleet Interactive Equipment Building Puget Sound Naval Shipyard - Bremerton, WA, $1,500,000

Fleet Interactive Equipment Building Bremerton, WA
  • 5,000 SF combined simulation areas, office, and classrooms
  • CIP concrete, structural steel, insulated panel construction, interior finishes
  • Computer access flooring
  • Halo system

TOP


topic head bulletUmatilla Chemical Weapons Depot Security System - Umatilla, OR, $1,100,000

Doyon Chiller installation, Edith Green Federal Building
  • Design-Build complete security and force protection system for two main gates at one of the largest chemical weapons depots in the United States
  • Project received prestigious “Product Manager Force Protection Systems For Excellence” award from US Army Corps of Engineers. Reportedly the only civilian entity or individuals ever to have received this award
  • Fully integrated anti-vehicle barriers, CCTV Cameras, Guardhouses, Detection and Prevention Systems

TOP


topic head bulletMakah Fish Hatchery - Neah Bay, WA, $1,600,000

Doyon Chiller installation, Edith Green Federal Building
  • Rebuilt 2,600 LF of serpentine channels, (dikes)
  • Over 8,000 CY Riprap
  • New intake structure, weirs, sluice gates, and large diameter piping
  • Wetlands construction of over 10 acres
  • Worked extensively with the Makah Tribal Tero office and assisted the Nation in establishing ongoing crushing operation to supply aggregate materials for project

TOP


topic head bulletNetul Trail Bridges - Astoria, OR

Netul Trail Bridges
  • Design-Build fabrication and installation of three new bridges at historic National Park where Lewis and Clark ended westward journey at Pacific Ocean
  • Innovative site design and substructure for 165’ bridge set in single piece reducing original design for one additional structure
  • Designed and utilized tidal action and low draft barges to install third bridge in remote environmentally sensitive area

TOP


topic head bulletUSACE Access Control Point Gate Installations, $1,883,098

ACP Installation
  • Preparation of three access control point sites for installation of the U.S. Army Automated Installation (AIE) System.

 

TOP


topic head bulletCorvallis Airfield Fuel Storage System Remediation - Corvallis, OR, $500,000

Doyon Chiller installation, Edith Green Federal Building
  • Removal of complete World War II era underground fuel distribution system throughout entire operating airfield
  • Approximately 2 miles of piping removed
  • PCS soil remediation

TOP