For this $6.2M Design-Build project, Doyon Logistics Services replaced the high security data center’s emergency generator plant at Tinker AFB, OK. Work included four paralleling diesel generator replacements, switchgear and feeder replacements, replacement of the dated fuel systems, remodeling of the building structure, and construction of haul routes for cranes and loads in excess of 100,000-lbs each.