Doyon Logistics Services was awarded this $593K Task Order contract off its Department of Veterans Affairs MATOC to renovate Fort Lawton Building, No. 240 at the American Lake campus of the VA Puget Sound Health Care System. The work included the installation of a new overhead coiling door in an existing CMU wall, provided an auxiliary loading dock lift, partitioned off a federal records storage area, and created a new exterior walkway. Mechanical, fire protection, and communication requirements were also included in this design-bid-build contract.