NAVFAC B162 Water Intrusion and Structural Repairs NAS Paxutent River, MD – $1.3M

Doyon Management Services is collaborating with the U.S. Naval Facilities Engineering Systems Command (NAVFAC), Mid-Atlantic, on a 270-calendar day project to address several critical aspects at the specified location:

  1. Steel Plate Roof Deck Replacement: The existing steel plate roof deck system will be replaced.
  2. Drainage System Addition: A new drainage system will be installed around the roof to mitigate chronic water leakage into Building B162 through the roof and foundation walls.
  3. Structural Concrete Rehabilitation: The project includes rehabilitation of structural concrete.

This comprehensive effort aims to enhance the building’s integrity, functionality, and resilience.