NAVFAC NRL-216 Install High Plume Exhaust System, DC – $5.6M

Doyon Management Services will be working with NAVFAC Washington on this 490 calendar day project to remove the exhaust duct and exhaust fans, provision of 316 stainless steel exhaust duct and rooftop high plume induced flow laboratory exhaust fan systems, integration of DDC controls with existing building DDC system and DDC front end located in building 57, patching and repairing of roof, shaft wall, shaft floor, and walls, painting, cleanup, and incidental related work while limiting disturbance to occupied lab spaces.