NAVFAC Bulkhead Repairs, Naval Station Newport, RI – $10.4M

Doyon Project Services will be working with NAVFAC Mid-Atlantic on this 702-calendar day, $10.4M project to replace three bulkheads at Naval Station Newport. Bulkhead 1 is a designed deadman anchored king system consisting of 30 open-end pipe pile with steel sheet piles. Bulkhead 2 includes a deadman anchored sheet pile wall and sloped riprap revetment […]

USAF Design-Build Hill AFB MACC – $385M

Doyon Management Services and Design Partner Design West will be working with the U.S. Air Force on this 5-year, $385M, Design-Build Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC). The Team will provide construction services for Hill AFB, the Utah Air National Guard, and its tenant units to design, manage, and accomplish a […]

NAVFAC Design-Build General Construction New London, CT and Newport, RI MACC – $249M

Doyon Management Services will be working with NAVFAC Mid-Atlantic on this 5-year, $249M Design-Build/Design-Bid-Build General Construction Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC). This was an 8(a) set-aside procurement and will provide construction services for the Public Work Departments in Newport, Rhode Island and Lew London, Connecticut but may include other areas […]

USFWS IDIQ MATOC in Support of the Great American Outdoors Act – $250M

Doyon Management Services was awarded a spot on the U.S. Fish and Wildlife Service’s nationwide 5-year Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction, maintenance, repair and alteration services. DMS will be working with the Department of Interior customers including the U.S. Fish and Wildlife Services, National Park Service, U.S. […]

USACE Repair Permanent Party Unaccompanied Enlisted Personnel Housing Building, JBLM, WA – $25.9M

Doyon Management Services will be working with the U.S. Army Corps of Engineers on this $25.9M, 540-calendar-day project to provide a complete renovation, including both interior and exterior repairs, for a complete and usable building for housing soldiers. The project will repair and reconfigure the existing barracks Building 09175, to align with the current standard […]

NPS Rehabilitate Historic Youngshome at the Charles Young Monument in Xenia, OH – $5.4M

Doyon Management Services will be working with the National Park Services (NPS) on this 395 calendar-day project to rehabilitate 4,500-SF of historic Youngs House to its period of significance of 1907-1922. Work includes but not limited to restoration and reconstruction of Queen Anne style window sashes, ornamental concrete block front porch, glass conservatory and pergola, […]

BLM Camp Host Site Improvements, Eugene, OR – $405K

Doyon Management Services (DMS) will be working with the Bureau of Land Management (BLM) on this 90 calendar-day project to improve site amenities at three camp sites around Eugene, OR. At the Clay Creek Recreation DMS will be extending the existing waterline, providing ADA upgrades and an asphalt driveway, upgrading electric power conduit and wiring […]

NOAA Calcasieu Pass Single Pile Instrumentation Pile (SPIP) Repair, Calcasieu Pass, LA – $223K

Doyon Technical Services will be working with the National Oceanic and Atmospheric Administration (NOAA) and the Center for Operational Oceanographic Products and Services (CO-OPS) on this 180 calendar-day project to strengthen the National Water Level Observing Network (NWLON) observing capabilities. This work requires investigation, procurement, and construction services for the demo and replacement of the […]

USACE Replace Chiller and Upgrade HVAC DDC Bldg. J01159, JBLM, WA – $459K

Doyon Management Services will be working with USACE Seattle at Joint Base Lewis-McChord on this 180 calendar-day project to provide and install a 20-ton packaged chiller and upgraded building J01159’s HVAC DDC system. The current chiller is in a failed condition and must be replaced. The project includes controlled removal and recycle of the existing […]