Naval Facilities Engineering Command (NAVFAC) Hampton Roads Waterfront MACC – $95M

Awarded in September 2018, Doyon Projects Services is working with the Naval Facilities Engineering Command (NAVFAC) on this 5-year, $95M Design/Build (DB) Design/Bid/Build (DBB) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for waterfront related projects primarily within the NAVFAC Mid-Atlantic, Hampton Roads Area of Responsibility (AOR).
Construction projects under this MACC primarily consist of new construction, repair, replacement, demolition, alteration, and/or improvements of waterfront projects. Types of waterfront projects include one or more of the following elements: piers; wharves; quay walls; dry docks; bulkheads; crane rail systems; fender systems; berthing and mooring; and waterfront related utilities (e.g., steam; low pressure compressed air; fresh water; salt water; sanitary sewer; oily waste water collection; high voltage to low voltage electrical; and fire protection systems) and required staging and performing construction in or over open tidal waters from barges and/or other floating or affixed work platforms.