NAVFAC Replace 15kV Feeder Cables, NSA Philadelphia, PA – $705K

Doyon Management Services worked with NAVFAC Mid-Atlantic on this 120 calendar day Design-Build project to replace two 15KV feeder cables feeding Building 4 and Building 5 from the 15KV Main Switch Room. This work was located inside buildings 4, 5, and 12, in underground ducts, manholes, and in the streets between the buildings at NSA-Philadelphia, Pennsylvania.