USACE Building & Garage Roof Replacement, MCRC Wilmington DE – $2.1M
Doyon Technical Services collaborated with NOAA on a 180-day project. The scope of work involved:
- Investigating, procuring, and constructing the removal and replacement of the existing boat launch platform based on plan sheets.
- Repairing the existing cathodic protection system.
- Performing miscellaneous coating repairs to prevent future corrosion issues on the existing SPIP (Structural Platform in Place).
- Including support brackets, clamps, plates, a cage ladder, and the upper instrumentation platform.
This project aimed to enhance the functionality and longevity of the existing infrastructure.