USACE Building & Garage Roof Replacement, MCRC Wilmington DE – $2.1M

Doyon Technical Services collaborated with NOAA on a 180-day project. The scope of work involved:

  1. Investigating, procuring, and constructing the removal and replacement of the existing boat launch platform based on plan sheets.
  2. Repairing the existing cathodic protection system.
  3. Performing miscellaneous coating repairs to prevent future corrosion issues on the existing SPIP (Structural Platform in Place).
  4. Including support brackets, clamps, plates, a cage ladder, and the upper instrumentation platform.

This project aimed to enhance the functionality and longevity of the existing infrastructure.