USCG Repair Water Shore-Ties & Heat Trace, USCG Base Boston, MA – $1.0M

Doyon Management Services collaborated with the US Coast Guard on a 150-day project. The scope of work included:

  1. Pressure testing and repairs on water pipes for water shore ties at Piers 1A, 1B, and Pier 3B.
  2. Replacement of associated heat trace cabling.
  3. Removal of three (3) water shore tie stations on Wharfs 1 & 2.
  4. Replacement of damaged pipe hangers.

This project aimed to enhance the functionality and reliability of the water infrastructure.