USSF DB Construct Mezzanine at Facility 67901, CCSFS, FL – $1.0M

Doyon Management Services is working with the U.S. Space Force on a 352-calendar day project to construct a mezzanine at Facility 67901 within the Cape Canaveral Space Force Station (CCSFS) in Florida. The scope of work entails several key tasks:

  1. Exterior Door Replacement: An existing double door will be replaced with an overhead coiling door.
  2. Infilling Opening: The opening above the new exterior door will be filled in.
  3. Equipment Removal: An existing paint booth will be removed.

This project aims to enhance the facility’s functionality and efficiency at the Cape Canaveral Space Force Station.