NAVFAC Building 29 Sims Hall 3rd Floor Renovation, NS Newport, RI – $549K
Doyon Technical Services will be working with NAFAC Mid-Atlantic on this 195 calendar day project to make modifications to the third floor, center wing of building 29 (Sims Hall) in order to support near future SCI and SAP war gaming events. The project will entail partitioning the 3rd floor of Sims Hall, center wing into seven separate rooms. Standard gypsum and steel stud wall construction will be used for the partition walls, as non-demising partitions, tied to the true floor and the suspended ceiling system. The project requires the furnishing and installation of doors, carpeting and wall base. Electrical distribution shall be provided from existing electrical panels to receptacles in the new walls and in the existing columns throughout the third floor providing electrical service to the interiors of these spaces.