USACE DLA DDC Building 7 and 8 Renovations, Tobyhanna, PA – $27.8M
Doyon Management Services will be working with USACE Charleston on this 580 calendar day project to provide complete interior renovation and FF&E package of the admin spaces associated with Building 7 including the restroom facilities, similar renovations to the restroom facilities in Building 8, repair to the extensively cracked floor slabs throughout bays 3-6 at Bldg. 7 with a resinous troweled gray epoxy mortar finish and safety floor markings, optional replacement of the air circulation systems in bays 3-6 of Bldg. 7, upgrade to the fire sprinkler system in bays 3-6 at Bldg. 7 including connection to the new fire sprinkler loop from Bldg. 8, removal of the existing racking systems in bays 3-6 at Bldg. 7, optional removal and replacement of the roof at bays 3-6 at Bldg. 7, replacement and new installation of the metal roof over the admin spaces and adjacent covered bays, upgrading of the fire walls between bays 2-6 at Bldg. 7 from 3-hour to 4-hour, enclosure of the Bay 3 loading dock similar to the newly enclosed dock at Bldg. 8, removal of angled loading docks at bay 5 of Bldg. 7, the addition of a partially enclosed ABA ramp for bay 5 at Bldg. 7, repair/repave of the parking area associated with bays 3-6 at Bldg. 7, and incidental related work.