USACE McChord Playground at J00681P JBLM, WA – $1.8M

Doyon Management Services will be working with USACE Seattle on this 365 calendar day project to construct a new playground including: to repair by replacement a sidewalk along 6th Street SW from D Street to E Street, repair by replacement of sidewalk along Col Joe Jackson Blvd between D Street and E Street, repair by replacement of sidewalk on the east side of E Street at the parking lot, a new sidewalk along E Street and through park, remove trees located in the project vicinity, to install Synthetic Turf Wear Surface (Artificial grass / turf) at locations under the Playground and Swing set locations, to build new sidewalk through the park, to construct a black chain-link fence around the perimeter of the playground. The playground will be a two-story structure with equipment appropriate for “School-Age” and “Pre-Teen” Age groups. It will also include a single axis (to-fro) swing set, a shade structure, benches, an airplane climber, spring riders, a free-standing spinner, and a zip line.