USSF Repair Titan 115kV Substation, CCSFS, FL – $954K

Doyon Management Services will be working with the U.S. Space Force on this 210 calendar day Design-Build project to replace forty-five 115KV vertical bus support insulators, six-115KV ganged switches, thirty-nine 115KV suspension insulators and twenty-five galvanized structural support braces at the Titan Substation on Cape Canaveral Space Force Station, FL.

USACE Armory Repairs, South Bend, IN – $1.7M

USFS Seed Extractory Building Site Improvements, Bend, OR – $1.5M

Doyon Management Services will be working with the U.S. Forest Service on this 180 calendar day project to provide electrical, mechanical, and site improvements at multiple buildings at the Bend Seed Extractory in Bend, OR. Work includes connection of restrooms from two buildings to City of Bend sewer system, replacement of halon fire suppression systems with new clean agent systems in two buildings, and new electrical controls and process integration for multiple buildings. Optional work includes new power backup generator for seed freezer building and rebuild of tree cooler humidification system.

NAVFAC Replace 15kV Feeder Cables, NSA Philadelphia, PA – $705K

Doyon Management Services worked with NAVFAC Mid-Atlantic on this 120 calendar day Design-Build project to replace two 15KV feeder cables feeding Building 4 and Building 5 from the 15KV Main Switch Room. This work was located inside buildings 4, 5, and 12, in underground ducts, manholes, and in the streets between the buildings at NSA-Philadelphia, Pennsylvania.

BLM Camp Host Site Improvements, Eugene, OR – $405K

NPS Wash Rack Installation, Vancouver, WA – $145K