NAVFAC Final Denial Barrier, NSA Mechanicsburg, PA – $998K

Doyon Management Services will be working with NAVFAC Mid-Atlantic on this 240 calendar day project to install a final denial barrier and ancillary ATFP features at the north gate and main entrance. The work includes but is not limited to, the work indicated on the drawings and specifications for W.O. #1668786. The work is located at the Naval Support Activity, Mechanicsburg, PA, approximately as indicated.

USACE Repair Permanent Party Unaccompanied Enlisted Personnel Housing Building, JBLM, WA – $25.9M

Doyon Management Services will be working with the U.S. Army Corps of Engineers on this $25.9M, 540-calendar-day project to provide a complete renovation, including both interior and exterior repairs, for a complete and usable building for housing soldiers. The project will repair and reconfigure the existing barracks Building 09175, to align with the current standard for Unaccompanied Enlisted Personnel Housing (UEPH). The building was originally constructed 1985-88 with 2/2 dwelling modules. The new layout for the building will be 1/1 dwelling modules to align with the UEPH guidelines.

NPS Rehabilitate Historic Youngshome at the Charles Young Monument in Xenia, OH – $5.4M

Doyon Management Services will be working with the National Park Services (NPS) on this 395 calendar-day project to rehabilitate 4,500-SF of historic Youngs House to its period of significance of 1907-1922. Work includes but not limited to restoration and reconstruction of Queen Anne style window sashes, ornamental concrete block front porch, glass conservatory and pergola, and fountain. The project also includes upgrades to electrical, lighting, heating, ventilation, and cooling, security systems, ADA accessibility of doorways, restrooms and installation of a passenger elevator.

BIA Kinlichee Paving Project, Ganado, AZ – $4.3M

Doyon Management Services will be working with the Bureau of Indian Affairs on this 6 month, $4.3M Design-Build project to repave, stripe, and improve drainage on 6 miles of the entrance road at the Kin Dah Lichi’I Olta School in in Ganado, AZ.

NAVFAC Repair Substation 1, Naval Base Kitsap Bangor, Silverdale, WA – $7.9M

Doyon Management Services will be working with NAVFAC Northwest on this 598-calendar day, Design-Bid-Build construction contract. Work for this project includes the retrofit of two 15kv vacuum breakers, installation of two new 15kV vacuum breakers, as well as 115kV substation upgrades, switchgear door replacements, new protective relays, protective devise coordination, supervisory control and data acquisition (SCADA) integration, installation of raceways, wire, fiber optic, cabling systems, and battery replacements. Our team is excited to continue our excellent relationship with NAVFAC Northwest and produce another safe and outstanding project.